The challenge
The homeowners wanted to cut their bills without spoiling the look of a house and garden they'd clearly put a lot of care into.
What we did
We used all-black panels laid out in two even rows across the rear roof, so the array sits flush and looks like part of the house. The front of the property is left untouched.
How we run projects like this
- A free survey of the roof, the fuse board and where the battery and inverter will go.
- A design based on your real usage, with a fixed price before any work starts.
- Installation by our own team, usually in one to two days, with the DNO notified for you.
- A full handover: how the system works, the app, and all your guarantee paperwork.



